I have almost finished the rebuild of the caravan. I am tired of the project. But am enjoying the use of it daily. The pictures below are pretty self explanatory. The phase 3 PV Solar electrical side of things is basically done. I have not got an inverter installed at present. But that is a simple thing to do. But I think I will stick to just using the solar for 12V for now. While finishing the last few things of the phase 2 rebuild I am busy building a separate portable toilet, shower, laundry unit. See the next blog post for details of that. I need a break and a change of pace. I am wondering what is next in my life for the rest of 2018. Phase 3 Solar PV system progress in pictures.
0 Comments
Leave a Reply. |
AuthorRory Archives
October 2020
Categories |